The Egyptian Company for Metro Management and Operation (E.C.M) announced its need to fill contract-based positions to operate and maintain the monorail train. Applications can be submitted from August 26 to September 4, 2025, either via the official website or at the administrative affairs office in Hammamat Al-Qubba building daily from 9 AM to 1 PM except Fridays. The Ministry of Transport has conducted trial runs of the Administrative Capital monorail line without passengers to test the network through the manufacturer, preparing for operation. The trial operation started gradually from the control center in the Administrative Capital to station 7 on Al-Moshir Axis, then reached station 4 in Nasr City, and finally the Stadium station. Stations consist of two floors: the first for ticketing and the second for the train platform, equipped with glass doors that open simultaneously with train doors to protect passengers.
Each station has passenger service facilities such as elevators, escalators, and stairs, with a single entrance on the first level. All stations are elevated.
Recommended for you
Exhibition City Completes About 80% of Preparations for the Damascus International Fair Launch
Unified Admission Applications Start Tuesday with 640 Students to be Accepted in Medicine
Talib Al-Rifai Chronicles Kuwaiti Art Heritage in "Doukhi.. Tasaseem Al-Saba"
Love at First Sight.. Karim Abdel Aziz and Heidi: A Love That Began with a Family Gathering and 20 Years of Marriage
Afghan Energy and Water Minister to Al Jazeera: We Build Dams with Our Own Funds to Combat Drought
Iron Price on Friday 15-8-2025: Ton at 40,000 EGP