Emsteel Group announced the supply of 5,000 tons of high-quality U-shaped bearing plates to the Suez Canal in Egypt, supporting the new floating movable bridge project. This bridge represents an advanced engineering solution that enhances the connection between the eastern and western banks of the canal without affecting maritime navigation, marking a new phase in infrastructure development along one of the world’s most strategic waterways.
Emsteel’s products form the essential foundation for the bridge’s pier structures, providing high durability and structural flexibility that ensure the sustainability of this vital crossing.
Recommended for you
Exhibition City Completes About 80% of Preparations for the Damascus International Fair Launch
Al-Jaghbeer: The Industrial Sector Leads Economic Growth
Talib Al-Rifai Chronicles Kuwaiti Art Heritage in "Doukhi.. Tasaseem Al-Saba"
Ministry of Media Announces the 10th Edition of 'Media Oasis'
Unified Admission Applications Start Tuesday with 640 Students to be Accepted in Medicine
Afghan Energy and Water Minister to Al Jazeera: We Build Dams with Our Own Funds to Combat Drought